You are here: Home » FAQ » FAQ

FAQ Category

FAQ

  • Q How long does it take to produce a preliminary detailed plan?

    A After receiving the client's drawings, we can produce a preliminary plan within 24hours at the earliest. Generally, it takes 2-3 days. During this time, we need to maintain communication with the client. The final time is subject to actual availability.
  • Q Once the final proposal is confirmed, how long does it take to ship?

    A Once the customer confirms the proposal, signs the contract, and pays the down payment, we typically ship within 10-14 days.
  • Q How long does it take to customize custom-made special-shaped panels and metal formwork?

    A For custom-made special-shaped panels, using aluminum or steel alloys, the customization and production time is approximately 7-10 days. For custom-made special-shaped panels using other alloys or completely new formwork specifications,the production time is approximately 45 days.
  • Q What after-sales service is available?

    A Upon product arrival, we will agree on a technical support period. Generally, we provide assembly guidance for the first three floors within 30 days. Additional technical support fees will apply for any additional floors beyond this time frame.Special arrangements can be made for special-shaped floors as needed. If any parts are missing or damaged upon product arrival, we will promptly resend them if the damage is caused by our fault. If the damage is caused by a third-party carrier, the third-party carrier will be responsible for compensation.
  • Q How do I maintain my purchased template?

    A We provide online guidance or video tutorials on template maintenance, helpingcustomers achieve the best possible results at the lowest cost. From the moment westart working with you, we'll provide comprehensive support.
It integrates R&D, production and construction services

QUICK LINK

PRODUCT CATEGORY

CONTACT US

WhatsApp: +8613892820888 
Tel: +86-13892820888
China Office Address: Room 30301, Building 12, Guobin Central District, No. 15 Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province 
Factory Address: No. 13 Xingyang Road, Yangling Demonstration Zone, Yangling Street, Yangling District, Xianyang City, Shaanxi Province 
Australia Addres: Level 12, 56 Pitt Street, Sydney, NSW, 2000, Australia
Hong Kong Address: Unit904, 9/F, Tower 2, Chinahongkong City. 33 Canton Rd Tsim Sha Tsui Hong Kong
Leave a Message
GET IN TOUCH
Copyright © 2026 Shaanxi Ingkol Metal Products Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy | Technical Support : Maizeng