You are here: Home » Services

Material Selection Comparison

Material Selection Comparison

Comparison table of material selection for Geju metal templates

Project typ Recommended materials Implementation standards Material standards Tensile strength Advantages
Ordinary building Aluminum alloy GB/T 228.1-2023 6061-T6 296 Environmentally friendly, recyclable,fast construction, lightweight, and noplastering required
Super high-rise Aluminum alloy, high-strength steel Q/TH DLG 005-2023 Q700L 755 Load-resistant, extremeweather-resistant, and adaptable
Special-shaped commercial buildings Aluminum alloy, steel formwork GB/T 6728-2024 Q235 500 Adapt to different shapes, low cost,small error
Buildings in hot and humid areas/high temperature areas, etc. Aluminum alloy, other alloys JT029-2025 LD+ZMA 755 Low cost, easy to transport,and adaptable to various climateenvironments

CONSTRUCTION PROCESS

Structural Line

After checking and verifying the leveling of slab, structural line must be indicated as per architectural and section drawings.

Off-Set Line

This is the setting out line that is "snapped" onto the concrete surface and offset normally 300mm from the internal face of the external wall.

Concrete Level Survey

Leveling must be checked prior to commencement of formwork installation to ensure accurate positioning.

Others - Vertical Rebar, M&E & Plumbing

The support works such as vertical rebar, mechanical & electrical and plumbing are to commence immediately once the installation is completed and confirmed by the project surveyor.

Wall Panel Positioning (I/C + Wall)

All setting must start with the positioning of I/C and wall. at the first setting, it is extremely important to apply sufficient quantity of form oil.

Beam & Slab Soffit Length

Starting from one side of the beam, fix the beam side to the beam soffits inserting the pins through the h[o]lling of the beam side into the beam soffit.

CUSTOM ENGINEERING SERVICES

Custom Formwork Design & Engineering Services | INGKOL Metal
We provide flexible standalone engineering services to fit your exact project needs—no full-process package required. Whether you need professional design support, drawing optimization, or direct supply based on your own list, our metal formwork team is ready to help.

PROJECT & DELIVERY PROCESS

Metal Formwork Production & Delivery Process | INGKOL
As a reliable metal formwork supplier, we follow a clear and transparent process to ensure on-time delivery and keep your construction project on track. We keep you updated at every step, with no hidden delays or unexpected changes.
01. Intent Deposit & Drawing Refinement
Once we receive your intent deposit, we start detailed drawing refinement. This stage normally takes 2 weeks, with flexibility based on your communication and feedback speed.
02. Formwork Design & Panel Matching
After drawings are approved, we complete formwork design and panel layout within 10 working days. We then confirm the final quantity and total project cost for your approval.
03. Prepayment & Mass Production
We require a minimum 30% prepayment to launch formal production. Standard production takes at least 2 weeks, depending on your order size and product type.
04. Factory Inspection & Optional Pre-Assembly
International clients are welcome to inspect finished goods at our factory. Pre-assembly testing is available for an additional fee if you need on-site verification before shipment.
05. Packing & Export Documentation
Classified packing takes about 7 working days. We prepare all customs and shipping documents in advance, so we can arrange immediate shipment once packing is finished.
06. Balance Payment & Shipment
Final payment must be completed before shipment. Our standard trade terms are FOB and CIF, and we accept T/T payment. We also support multiple currency settlements to accommodate your local business needs.
07. For simple standard products (pool tanks, road baffles, etc.)
Once dimensions are confirmed, the entire process (design to shipment) can be finished in just 2 weeks.
08. For clients with existing BOM/panel list
We skip the design phase and move straight to production, saving you time and unnecessary costs.

ON-SITE SUPPORT & ONE-STOP SOLUTIONS

On-Site Support & Full Building Solutions | INGKOL
We go beyond formwork solutions to provide complete support for your whole project. Our services are designed to reduce your workload, keep construction smooth, and lower overall project risks.
Why Choose Us
  • Installation & Technical Support
    • Full-process orders include free on-site support for the first 3 floors or up to 2 weeks (whichever comes first; standard coverage is 2 weeks).

    • If you need support beyond the free scope (extra floors or longer duration), we offer affordable paid extended service.

    • On-site engineer support can also be purchased separately for any project, regardless of order type. We respond to all technical inquiries within 12 hours to avoid unnecessary on-site downtime.
  • One-Stop Building Material Supply
    With Yonfron Group’s full construction industry resources, we can source and coordinate high-quality building materials for your project:
    • Windows and doors

    • Flooring and wall panels

    • Structural and finishing materials

    This helps you simplify your supply chain, cut communication costs, and maintain consistent quality across your entire construction project.
  • Labor & After-Sales Support
    Our group’s professional construction labor team is available for on-site work at negotiated rates.

    • We keep a steady stock of spare parts for fast replacement, so your construction never stops waiting for small components.
It integrates R&D, production and construction services

QUICK LINK

PRODUCT CATEGORY

CONTACT US

WhatsApp: +8613892820888 
Tel: +86-13892820888
China Office Address: Room 30301, Building 12, Guobin Central District, No. 15 Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province 
Factory Address: No. 13 Xingyang Road, Yangling Demonstration Zone, Yangling Street, Yangling District, Xianyang City, Shaanxi Province 
Australia Addres: Level 12, 56 Pitt Street, Sydney, NSW, 2000, Australia
Hong Kong Address: Unit904, 9/F, Tower 2, Chinahongkong City. 33 Canton Rd Tsim Sha Tsui Hong Kong
Leave a Message
GET IN TOUCH
Copyright © 2026 Shaanxi Ingkol Metal Products Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy | Technical Support : Maizeng