You are here: Home » News

NEWS

  • 2026-01-05
     
    Formwork selection is not a catalog choice. It is a decision about cycle time, labor pressure, wall quality, maintenance burden, residual value, and project cash flow. This 2026 guide explains why pure metal formwork is becoming the competitive standard, how to compare Q235 steel, Q700 steel, galvanized steel, ZAM-type Zn-Al-Mg coated steel, and 6061-T6 aluminum, and how Ingkol Metal connects overseas contractors with Yonfron Group-backed manufacturing, engineering, leasing, and financial resources. The paper also explains Ingkol's mixed-assembly approach, combining tie-rod, flat tie, ZAM steel, and aluminum systems in one optimized project solution.
  • 2025-12-31
     
    Since its official launch on July 1, 2025, Ingkol Metal has achieved a leapfrog development in just half a year. This article reviews the key milestones from the launch on Alibaba platform to the deepening of the market in Central Asia, and highlights the core technological transformation in 2026: a comprehensive upgrade from the traditional Q700 spray-painted steel template to the ZAM (zinc-aluminum-magnesium) steel template. Relying on the manufacturing and financial strength of its parent company, Yongfron Group, it defines the new standards for future template engineering.
  • 2025-12-22
     
    From December 15th to 19th, 2025, Umbriel Temiraliev, the general manager of FEZ in Bishkek, visited Xi'an to conduct a high-level inspection of Ingkol Metal's advanced manufacturing base, on-site construction applications, and leasing business model. Under the reception of Mr. Yang Rongfeng, the founder and chairman of Yonfron Group, and accompanied by Mr. Yang Borui, the founder of Ingkol Metal, both parties conducted in-depth discussions on long-term manufacturing and leasing cooperation in the infrastructure market of Kyrgyzstan and Central Asia.
  • 2025-12-10
     
    As building projects become taller, faster, and with more complex geometries, template design can no longer rely solely on 2D CAD drawings and on-site experience. This article explores how Ingkol Metal utilizes 3D BIM technology for virtual pre-assembly and collision checks, eliminating errors, optimizing costs, and reducing waste before materials arrive at the construction site.
  • 2025-11-26

     

    This article provides a detailed analysis of the crucial role of custom steel formwork in bridge and underground pipe gallery projects. By combining practical cases of the Kunming Road Elevated Road and Science Avenue Pipe Gallery, it reveals how Ingkol Metal utilizes heavy steel formwork to address extreme lateral pressure and precision challenges.

  • Total 5 pages  Go to Page
  • Go
It integrates R&D, production and construction services

QUICK LINK

PRODUCT CATEGORY

CONTACT US

WhatsApp: +8613892820888 
Tel: +86-13892820888
China Office Address: Room 30301, Building 12, Guobin Central District, No. 15 Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province 
Factory Address: No. 13 Xingyang Road, Yangling Demonstration Zone, Yangling Street, Yangling District, Xianyang City, Shaanxi Province 
Australia Addres: Level 12, 56 Pitt Street, Sydney, NSW, 2000, Australia
Hong Kong Address: Unit904, 9/F, Tower 2, Chinahongkong City. 33 Canton Rd Tsim Sha Tsui Hong Kong
Leave a Message
GET IN TOUCH
Copyright © 2026 Shaanxi Ingkol Metal Products Co., Ltd. All Rights Reserved.| Sitemap| Privacy Policy | Technical Support : Maizeng