You are here: Home » Projects » Business Projects » Sunac Yuhe Chenyuan DK-3 Project
GET IN TOUCH

Sunac Yuhe Chenyuan DK-3 Project

Views: 0     Author: Site Editor     Publish Time: 2026-05-07      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button
Sunac Yuhe Chenyuan DK-3 Project

Basic Project Information

Project Location

200m east of the northeast corner of the intersection of Xianping Road and Zhonghua West Road, Qindu District, Xianyang City, Shaanxi Province

Project Type

High-rise Residential

Completion Time

2023

Core Project Parameters

Building Scale

232,200 m²

Building Scale

3 years

Core Requirements

Formwork flatness and stiffness meet standards; complete set of accessories; high turnover rate

Products & Solutions

Product Provided

Aluminum Alloy Formwork

Solution Adopted

Rental

Pain Points & Solutions

Client Pain Points:

1. Conflicts between civil engineering and MEP, door/window, and secondary structure drawings; bay windows, balconies, structural columns, and water-stop kickers not detailed in one go.

2. Unreasonable panel layout for door/window openings, internal/external corners, and exterior wall lines; excessive joints leading to grout leakage and offsetting.

3. No pre-assembly at the factory, resulting in large on-site dimensional deviations and frequent rework.

Our Solutions:

1. Conduct full-discipline aluminum formwork detailing in advance, integrating structural columns, kitchen/bathroom kickers, door/window rebates, and drip lines into one-time cast-in-place.

2. Optimize panel layout design: use dedicated corner aluminum for internal/external corners to reduce scattered small panels; install standard K-plates on exterior walls to control inter-floor offsetting.

3. Conduct 1:1 trial assembly and numbering at the factory; pack and deliver only after passing inspection, then assemble on-site by number.

Project Achievements

Project Outcomes:

1. QC Achievement Award, Shaanxi Construction Industry Association

2. Safe & Civilized Standardized Construction Site, Xianyang City

Client Feedback:

The full aluminum formwork system delivers excellent verticality and flatness.

Cooperation Information

Cooperation Model:

Full Rental Model

Supporting Services:

Design, manufacturing, transportation, on-site technical guidance, and after-sales maintenance

Projects2-2.jpg
Projects2-3.jpg

It integrates R&D, production and construction services

QUICK LINK

PRODUCT CATEGORY

CONTACT US

WhatsApp: +8613892820888 
Tel: +86-13892820888
China Office Address: Room 30301, Building 12, Guobin Central District, No. 15 Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province 
Factory Address: No. 13 Xingyang Road, Yangling Demonstration Zone, Yangling Street, Yangling District, Xianyang City, Shaanxi Province 
Australia Addres: Level 12, 56 Pitt Street, Sydney, NSW, 2000, Australia
Hong Kong Address: Unit904, 9/F, Tower 2, Chinahongkong City. 33 Canton Rd Tsim Sha Tsui Hong Kong
Leave a Message
GET IN TOUCH
Copyright © 2026 Shaanxi Ingkol Metal Products Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy | Technical Support : Maizeng