Views: 0 Author: Site Editor Publish Time: 2026-05-07 Origin: Site
Basic Project Information | Project Location | Northwest corner of the intersection of Yunshui 2nd Road and Tiangu 5th Road, Software New City, Xi'an High-Tech Zone |
Project Type | Corporate Headquarters Building | |
Completion Time | 2023 | |
Core Project Parameters | Building Scale | 145,000 m² |
Building Scale | 2 years | |
Core Requirements | Quality / On-time Delivery | |
Products & Solutions | Product Provided | Aluminum Formwork |
Solution Adopted | Rental |
Pain Points & Solutions
Client Pain Points:
1. Numerous high-formwork areas with complex load-bearing conditions in the aluminum formwork support system, posing high safety risks.
2. Diverse architectural forms with many special-shaped nodes, making formwork layout and detailed design very challenging.
3. Complex structure of the 2 underground floors with limited space for aluminum formwork assembly and strict anti-leakage requirements.
Our Solutions:
1. Specialized design for high-formwork areas with reinforcement at connections.
2. Custom formwork layout for special-shaped nodes, verified through factory trial assembly.
3. Space optimization and phased construction, with dedicated anti-leakage treatment.
Project Achievements
Project Outcomes:
1. 2023 First Batch Shaanxi High-Quality Structural Engineering Award
2. 2024 First Batch Two-Star Green Construction Evaluation Project
3. High-Tech Zone Silk Road Software City Engineering Construction Benchmark Project
Client Feedback:
Achieved four key improvements in the project: quality, efficiency, sustainability, and cost-effectiveness.
Cooperation Information
Cooperation Model:
Full Rental Model
Supporting Services:
Design, manufacturing, transportation, on-site technical guidance, and after-sales maintenance