You are here: Home » News » Super High-Rise Buildings (Residential & Office): 4-Day Cycle Efficiency
GET IN TOUCH

Super High-Rise Buildings (Residential & Office): 4-Day Cycle Efficiency

Views: 0     Author: Site Editor     Publish Time: 2026-04-07      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Core Products: Aluminum Alloy Formwork System (AL 6061-T6) + Independent Steel Support System.

Target Pain Points: Tight construction schedules, high labor costs, crane bottlenecks, and stringent verticality requirements .

● Solution Overview:

For towers exceeding 30 stories, INGKOL utilizes Monolithic Pouring Technology. This allows the simultaneous casting of walls, beams, slabs, and staircases . By integrating our Early Stripping (Prop Head) System, panels can be dismantled and cycled to the next level within 36-48 hours, achieving a high-speed 4 to 5-day floor cycle .

● INGKOL Competitive Edge:
  • Plaster-Free Finish: Achieves a "fair-faced concrete" effect with flatness controlled within ±2mm. This eliminates the need for internal plastering, saving approximately $3-5 per square meter in secondary finishing costs .

  • Safety Perimeter: Compatible with the our Construction Safety Protection Climbing Frames (Blue Mesh), providing a fully enclosed, secure environment for high-altitude operations.

  • Crane Independence: Weighing only 25kg/㎡, the system is man-portable, significantly reducing the load and wait times for tower cranes .

It integrates R&D, production and construction services

QUICK LINK

PRODUCT CATEGORY

CONTACT US

WhatsApp: +8613892820888 
Tel: +86-13892820888
China Office Address: Room 30301, Building 12, Guobin Central District, No. 15 Keji 7th Road, High tech Zone, Xi'an City, Shaanxi Province 
Factory Address: No. 13 Xingyang Road, Yangling Demonstration Zone, Yangling Street, Yangling District, Xianyang City, Shaanxi Province 
Australia Addres: Level 12, 56 Pitt Street, Sydney, NSW, 2000, Australia
Hong Kong Address: Unit904, 9/F, Tower 2, Chinahongkong City. 33 Canton Rd Tsim Sha Tsui Hong Kong
Leave a Message
GET IN TOUCH
Copyright © 2026 Shaanxi Ingkol Metal Products Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy | Technical Support : Maizeng