Views: 0 Author: Site Editor Publish Time: 2026-04-07 Origin: Site
Core Products: Aluminum Alloy Formwork System (AL 6061-T6) + Independent Steel Support System.
Target Pain Points: Tight construction schedules, high labor costs, crane bottlenecks, and stringent verticality requirements .
For towers exceeding 30 stories, INGKOL utilizes Monolithic Pouring Technology. This allows the simultaneous casting of walls, beams, slabs, and staircases . By integrating our Early Stripping (Prop Head) System, panels can be dismantled and cycled to the next level within 36-48 hours, achieving a high-speed 4 to 5-day floor cycle .
Plaster-Free Finish: Achieves a "fair-faced concrete" effect with flatness controlled within ±2mm. This eliminates the need for internal plastering, saving approximately $3-5 per square meter in secondary finishing costs .
Safety Perimeter: Compatible with the our Construction Safety Protection Climbing Frames (Blue Mesh), providing a fully enclosed, secure environment for high-altitude operations.
Crane Independence: Weighing only 25kg/㎡, the system is man-portable, significantly reducing the load and wait times for tower cranes .